RigVoyage
Rig training · simulators · careers

Built by the crew, for the crew.

Training, simulators and a profile recruiters can see.

BB17 · 3D jack-up model
The training wellGeneric offshore well · 30° tangent · TD 10,050 ft MD / 9,207 ft TVD
36" × 30"Conductor
350 ft
26" × 20"Surface casing
shoe 1,335 ft
17½" × 13⅜"Intermediate
shoe 4,100 ft
12¼" × 9⅝"Production casing
shoe 8,985 ft
8½" × 7"Reservoir liner
shoe 10,035 ft
BB17 drill floor: iron roughneck, rotary table and two floormen at hole centre
Rig simulator

Every operation, on the drill floor and down the hole.

Jack up, spud the 36" hole and work through each section the way it's done on a real rig: crane lifts, running and cementing casing, nippling up and testing the BOP, FITs, directional drilling and tripping.

  • Live gauges, MWD panel, casing tallies and cement unit charts
  • A gas kick in the reservoir, shut in and killed with the Driller's method
  • 7" liner run, set, cemented and tested on drill pipe
  • New: driller's chair (cyber chair): drill a stand down and make a connection yourself, scored
See the rig simulators →
World map with offshore rigs by type and land rig counts by country
Rig Locator

Where the rigs are working.

Jack-ups, semisubs, drillships, tender, platform and land rigs on a world map, each with its contractor, operator, field and status. Land activity is shown as rig counts by country and US basin.

  • Built from contractor fleet reports, contract news and Baker Hughes counts
  • Updated every week, with the source and report date on each rig
Open the Rig Locator ↗
Well control preparation

Find well control hard? Resitting? First exam nerves?

You're not the only one. Our preparation explains it the way it works on the rig, works every kill sheet step by step, and lets you practise under exam conditions at home until you're ready.

See the well control preparation →
IWCF Level 2 preparation · Rig crew

Well control preparation: Level 2

For roustabouts, floorhands and derrickmen. Eight sessions: pressure, kicks, trips, shut-in and the equipment, with a full review behind every wrong answer, then a 25-question mock.

IWCF Level 3 preparation · Driller

Well control preparation: Level 3

Fourteen sessions with drills, step-by-step calculator workings and a full review for every wrong answer, then two mock exams and a simulator assessment.

IWCF Level 4 preparation · Supervisor

Well control preparation: Level 4

For toolpushers, drilling supervisors and company men. Barriers, kick tolerance, gas behaviour, deviated kill sheets, choosing the method, volumetric control, stripping and bullheading, diagnosing problems and the equipment you sign for. Then a 30-question mock.

Land to offshore · Roustabout to driller

Your first step from land to offshore

For land crews moving offshore. Nine short modules from the heliport to the drill floor: the helicopter crew change on BB17, induction and alarms, living on the rig, a guided rig tour, safety, a role track for your job, well control offshore and emergencies. Pass the final check for the Offshore Ready badge.

Rig Launch · Introduction to the rigs

Rig Launch

For anyone who wants to work on a drilling rig. Eight short modules: what a rig does, the jobs and how you move up, life on the rig, safety, the equipment, your first days on the floor and how to get hired. Pass the final check for the Rig Ready badge.

Crew search: profiles with positions, years, rig types, tickets and interview badges
Career centre

One profile. Every recruiter.

Stop chasing every job ad. Build your crew profile once from your CV and tickets, and recruiters, labour hire, drilling contractors and operators find you. They see your rigs, your years and which tickets are in date, then ask for an introduction.

You choose whether you're in the search, and your name stays hidden until you say yes. Land or offshore, roustabout to drilling supervisor.

Hiring? Search crew who are ready to go, by position, rig type and valid tickets.

Open the career centre →